
Best Preparations of C_TS422_2020 Exam 2022 SAP Certified Application Associate Unlimited 150 Questions
Focus on C_TS422_2020 All-in-One Exam Guide For Quick Preparation.
SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Master Data in SAP S/4HANA | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Advanced Planning in SAP S/4HANA | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Material Requirements Planning in SAP S/4HANA | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Production Orders in SAP S/4HANA | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Lean Manufacturing in SAP S/4HANA | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Introduction to SAP S/4HANA Production Planning | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Demand Management in SAP S/4HANA | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Capacity Planning in SAP S/4HANA | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Introduction to SAP S/4HANA Supply Chain Planning | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
NEW QUESTION 31
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- B. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- C. MRP creates capacity requirements without checking the capacity of a work center.
- D. MRP creates capacity requirements only if the work center has sufficient capacity.
Answer: C
NEW QUESTION 32
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.
- A. One-off events
- B. Past sales order quantities
- C. Market intelligence
- D. Past quotation quantities
- E. Past procurement quantities
Answer: A,B,C
NEW QUESTION 33
What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer.
- A. Multid imensional Reporting client (MDRC)
- B. ABAP Managed Core Data Services (CDS)
- C. HANA Live
- D. Smart Business Cockpit
Answer: B
NEW QUESTION 34
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.
- A. Direction (forward/backward)
- B. Finiteness level (0...1)
- C. Scheduling control (finite/infinite)
- D. Fixed pegging (on/off)
- E. Planning mode (bucket/sequence)
Answer: A,C,E
NEW QUESTION 35
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?
- A. Material Requirements Planning (MRP)
- B. Capacity Requirements Planning (CRP)
- C. Demand Planning (DP)
- D. Supply Network Planning (SNP)
Answer: A
NEW QUESTION 36
Which time elements can be reduced by a reductionstrategy? Note: There are 3 correct answers to this question.
- A. Wait time
- B. Float after production
- C. Move time
- D. Goods receipt processing time
- E. Queue time
Answer: B,C,E
NEW QUESTION 37
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A. Pick/pack time
- B. Wait time
- C. Move time
- D. Queue time
- E. Float before production
Answer: A,B,D
NEW QUESTION 38
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
- A. Use the material staging report.
- B. Use the batch information cockpit.
- C. Use batch determination.
- D. Use the material where-used report.
Answer: B
NEW QUESTION 39
Which technological advances enabled the development of SAP S/4HANA as the digital core?
There are 3 correct answers to this question.
- A. Wide adoption of web standards such as Service oriented architecture
- B. Big and affordable memory
- C. Multi core processors enabling parallelism of tasks
- D. Capability to add to server landscape and scale
- E. Advances in the three-tier architecture approach
Answer: A,C,D
NEW QUESTION 40
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.
- A. The display template for material numbers applies to all clients.
- B. In Customizing you can decide by material type whether to use the long material number.
- C. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
- D. The number of leading zeros for internal numbers is client-specific.
Answer: A,C
NEW QUESTION 41
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
- A. Archiving of documents for assembly scrap
- B. Material staging for next order in sequence
- C. Posting of goods receipt for the product
- D. Posting of production costs to the production cost collector
- E. Reduction of associated capacity requirements
Answer: C,D,E
NEW QUESTION 42
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.
- A. It is used by engineering to identify sub items in an engineering bill of material(BOM).
- B. It is used by product costing to determine how costs are rolled up.
- C. It is used by ATP to determine the priority of alternative components.
- D. It is used in MRP to determine the sequence in which materials are planned.
Answer: B,D
NEW QUESTION 43
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? There are 3 correct answers to this question.
- A. Archiving of documents for assembly scrap
- B. Material staging for next order in sequence
- C. Posting of goods receipt for the product
- D. Posting of production costs to the production cost collector
- E. Reduction of associated capacity requirements
Answer: C,D,E
NEW QUESTION 44
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?
- A. Top of Red Base
- B. Top of Yellow
- C. Top of Green
- D. Top of Red
Answer: C
NEW QUESTION 45
A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?
- A. Change the explosion type of the phantom assembly in the BOM.
- B. Change the phantom item indicator for the phantom assembly in the BOM.
- C. Change the special procurement key of the phantom assembly in the BOM.
- D. Change the item category of the phantom assembly in the BOM.
Answer: A
NEW QUESTION 46
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Sales order-specific planning run is required.
- B. Sales order-specific stock is created
- C. Storage location MRP areas are required.
- D. Net requirements calculation is sales order-specific.
- E. Production orders are created with sales order reference.
Answer: B,D,E
NEW QUESTION 47
What are some of the advantages of using Kanban? There are 2 correct answers to this question.
- A. It is a simplified form of production control
- B. It is mostly accomplished by manual postings
- C. Replenishments are created close to the actual need
- D. Replenishments are based on centralized planning
Answer: A,C
NEW QUESTION 48
For what production type are production orders used?
- A. Period and quantity-oriented production
- B. Replenishment controlled by control cycles
- C. Process manufacturing processes
- D. Discrete manufacturing processes
Answer: D
NEW QUESTION 49
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?
- A. The requirement no longer exists
- B. A firmed planned receipt cannot be rescheduled
- C. The requirements date occurs before that of a firmed planned receipt
- D. The requirements date occurs that of a firmed planned receipt
Answer: C
NEW QUESTION 50
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?
- A. Fill up to the safety stock level
- B. Fill up based on the lot size procedure
- C. Fill up to the reorder stock level
- D. Fill up to the maximum stock level
Answer: B
NEW QUESTION 51
In Demand-Driven Replenishment, materials are classified according to several criteri a. What criteria can you use?
There are 3 correct answers to this question
- A. Average daily usage
- B. Minimum order quantity
- C. Usage in bill of materials
- D. Goods issue value
- E. Demand variation
Answer: C,D,E
NEW QUESTION 52
You are transferring data from SAP S/4HANAIo embedded PP/OS. What master data objects are mapped to a location? There are 3 correct answers to this question.
- A. Workcenter
- B. Plant
- C. Supplier
- D. Customer
Answer: B,C,D
NEW QUESTION 53
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.
- A. Assign the overall profile to the authorization profile.
- B. Create object selection variant for resource-related alerts
- C. Create object selection variant for transportation lane-related alerts.
- D. Create object selection variant for product-related alerts.
- E. Assign the alert profile to the overall profile.
Answer: B,D,E
NEW QUESTION 54
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?
- A. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
- B. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
- C. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
- D. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
Answer: C
NEW QUESTION 55
The MRP run detected a shortage of a material that you source from an external supplier in full pallets. How can you make sure you will only receive full pallets?
- A. Use the fixed lot size procedure.
- B. Use the reorder point.
- C. Use the minimum order quantity.
- D. Use the MRP type for vendor managed inventory.
Answer: A
NEW QUESTION 56
......
C_TS422_2020 Exam Certification Details:
| Sample Questions: | SAP C_TS422_2020 Exam Sample Question |
| Duration: | 180 mins |
| Languages: | English |
Guaranteed Success with C_TS422_2020 Dumps: https://testking.practicematerial.com/C_TS422_2020-questions-answers.html

