Latest HP HPE6-A80 First Attempt, Exam real Dumps Updated [Mar-2022]
Get the superior quality HPE6-A80 Dumps Questions from PracticeMaterial. Nobody can stop you from getting to your dreams now. Your bright future is just a click away!
NEW QUESTION 25
A network architect plans to propose a virtual Mobility Master (VMM) tor a new solution. The solution will support up to 4.800 wireless client devices and include:
* two Virtual Mobility controllers (VMCs) in a cluster
* 180 APs
Which licenses should the architect propose?
- A. 1 MM-VA-IK:I MC-VA-250; 180 Enterprise licenses
- B. 1 MM-VA-500; 2 MC-VA-250; 540 Enterprise licenses
- C. 1 MM-VA-1K; 2 MC-VA-25Q; one Enterprise license
- D. 1 MM-VA-500; 1 MC-VA-250; 180 Enterprise licenses
Answer: A
NEW QUESTION 26
in which scenario do Aruba CX 6400 Series switches, but not Aruba 6300M Series switches, meet the needs Tor a wired upgrade?
- A. The customer requires switches in the same closet to operate together as a single switch for Link Aggregation but to be managed as separate devices.
- B. The customer has recently deployed Aruba AP-535 APs and is concerned about a future-proof wired edge that will continue to support expanding bandwidth requirements.
- C. The customer requires each access layer switch to support at least 25Gbps on its fiber uplinks at all times; including if up to one uplink tails.
- D. The customer requires enhanced redundancy at the access layer and wants to ensure that each switch can continue to operate even if a power supply fails
Answer: A
NEW QUESTION 27
A customer has an existing; Aruba wireless solution to provide wireless access for employees. The solution Includes Aps, mobility controllers (MCs) at the network core, and a Mobility Master (MM} A customer would like to set up a separatelymanaged guest network and have the traffic go directly to the DMZ.
What should the architect suggest as the simplest solution that meets the requirements?
- A. Double the number of APs and controllers.
- B. Use MulitZone, and put a mobility controller in Itie DMZ.
- C. Have a dedicated mobility controller in the DMZ managed by the same MM
- D. Add APs in a dedicated AP group to support only the guest network SSID.
Answer: B
NEW QUESTION 28
The architect plans to recommend an upgrade to Aruba CX switches
What is one requirement for the new solution that justifies this recommendation?
- A. the requirement to support tunneled-node at the access layer
- B. the requirement to support smart Rate at the access layer
- C. the requirement to support larger ARP tables at the aggregation layer
- D. the requirement to support secure IPsec tunneling at the aggregation layer
Answer: D
NEW QUESTION 29
Refer to the exhibit.
A customer needs a wireless network upgrade and has these requirements.
- Support any applications used on a wired connection
- Support up to 2500 wireless clients
- Support seamless roaming from floor to floor and building to building
- Continue to function seamlessly if one controller fails
The architect has designed the logical infrastructure for the network as shown in the exhibit Which change should the architect make to belter meet customer requirements and besl practices?
- A. Combine me /25 subnets for wireless and wired users into a /16 subnet.
- B. Combine the /25 subnets for wireless users into a /20 subnet
- C. Place each controller in a different VLAN and subnet.
- D. Install additional Mobility Controller.
Answer: D
NEW QUESTION 30
Refer to the exhibit.
A customer needs to create a proposal for a full wireless solution for a customer The customer has indicated that the MCs will connect to Aru&a CX Switches at the core and the APs will connect to PoE-i- switches at the edge. The customer requires that the wireless solution support at least 50 Mbps concurrently per AP. The architect has created a BOM tor a Mobility Master (MM), two MC 721os, and 400 AP-535S. me exhibit snows this BOM.
Which components has the architect forgotten?
- A. Sufficient Enterprise licenses for the APs on both MCs
- B. SFP+ transceivers tor the MC connections
- C. Mounting Kits tor the MOs and MM
- D. Smart Rate PoE+ injectors for the APs
Answer: C
NEW QUESTION 31
A company has several remote sues that operate more or less autonomously. Each site has ns own local services and Internet connection However the company does have a main office with a few centralized resources that the company would like to make available to remote office employees over the Internet connection. Sites range in size and require between 10 and 20 APs.
The customer requires the most cost-effective solution that meets the requirements.
Which solution should the architect recommend for each remote site?
- A. an IAP cluster with an IPsec tunnel to a main office MC
- B. Campus APs (CAPS) with CPSec control channels to a main office MC
- C. Remote APs (RAPs) with IPsec tunnels to a main office MC
- D. Campus APs (CAPs) with a local MC that has an SD-WAN license
Answer: D
NEW QUESTION 32
A customer has an existing Aruba wireless solution at their campus. This solution is shown in the exhibit.
The customer now wants to enhance seamless roaming and failover across the solution. The customer wants the least expensive solution that still meets the needs.
Which figure shows the correct changes to the solution to meet the new needs?
A)
B)
C)
D)
- A. Option D
- B. Option C
- C. Option B
- D. Option A
Answer: D
NEW QUESTION 33
A hospital wireless network must support many different types of users and devices, including:
* Visitors who access the Internet
* Admin staff, who run applications such as scheduling
* Medical staff, who look up patient info on their tablets
* Patient monitoring devices, which must not lose any traffic
* Communicator badges, which support real-time voice to allow nurses and doctors to communicate The hospital needs to ensure that the most vital and time-sensitive traffic is prioritized and that visitors do not interfere with hospital applications. The MC should mark traffic that passes through it for an appropriate priority.
Which plan meets the needs? (The plans describe firewall roles and rules but do not need to use correct syntax. Note that security roles are also not included.)
- A. Communicator = Highest. Patient monitoring = Highest. Medical staff = High. Admin staff = Normal: Visitors = Low.
- B. Patient monitoring = Highest. Medical staff = Highest. communicators = High. Admin staff = High. Visitors = Normal.
- C. Medical staff = Highest. Communicator = High. Patient monitoring = High. Admin = High. Visitors = Normal
- D. Medical staff = Highest. Patient monitoring = Highest. Admin staff - High. Communicator = Normal. Visitors = Low.
Answer: D
NEW QUESTION 34
A company already has an Aruba wireless network The network currently consists of:
* oneMM-HW-1k
* two 7210 MCs in the network core
* two 721GMCsintheDMZ
* 200 AP-515S in Building 1 and Building 5
100 AP-515S each In Building 2r Building 3, and Building 4
The customer now wants to assess if it needs local Mobility controllers (MC) for any buildings:
- Building 1 is the main office building for the campus. It supports the highest number of APs. It connects to the network core without an aggregation layer.
* Building 2 is further away from the Building i. and no roaming is provided between it and the other buildings its access layer connects to the network cone with a pair of Aruba CX 6300M aggregation switches.
* Building 3 is further away from the other buildings, it connects to the network core without an aggregation layer.
The Guest SSID traffic should be tunnelled to the DMZ controllers
' Building 4 has its own local datacenter and Internet connection. The company would like it to be able to operate completely autonomously if its aggregation layer loses connectivity with the core.
* Building 5 is further away from the other buildings, it connects to the network core without an aggregation layer.
This building has been assigned to a partner that would like to manage a dedicated SS1D using the shared AP infrastructure.
In which two buildings should the network architect plan local mobility controllers (MCs)? (Select two)
- A. Building 3
- B. Building 5
- C. Building 1
- D. Building 4
- E. Building 2
Answer: A,C
NEW QUESTION 35
Refer to the exhibit.


A customer needs a wired network upgrade and has complained about performance issues. The architect collected information about traffic now on several switch ports in different locations across the network, and the results are shown in the exhibit. Each of these ports is a 1Gbps port.
What can the architect conclude?
- A. Port 1 shows periods of congestion; other ports are not congested.
- B. None of these ports show any periods of congestion
- C. All of the ports show serious congestion
- D. Port 3 snows periods of congestion; other ports are not congested.
Answer: B
NEW QUESTION 36
Refer to the exhibit.

A customer needs to support resilient wireless services
What is one way that this design helps to minimize me impact of a railed access layer switch on these services?
- A. APS in the same area connect to different switches.
- B. The switches support Smart Rate and dual home AP connections.
- C. Each access layer switch has two redundant links to the core.
- D. The 8400s and G405s use Virtual Switching Extension (VSX) in cone and access.
Answer: B
NEW QUESTION 37
Refer to the exhibit.
A hospital needs an upgrade to 802.1tax for its wireless network. The wireless network supports:
* wireless medical devices
* medical staff voice communicators
* laptops in nurse stations
* medical staff tablets
* visitor and patient personal devices.
All of these devices support both the 2 4GHz and 5GH2 band. Assuming about a max throughput on50 Mbps per AP; the hospital would like. The architect has used VisualRF to plan the AP placement on one of the floors, which the hospital expects will need to suppod about 800 win to deploy APS in stairwells between floors.
How well does the plan meet the requirements?
- A. The current AP placement meets the customer requirements in terms of coverage and capacity.
- B. The current AP placement meets coverage requirements, but does not meet capacity requirements.
- C. The current AP placement fails to provide adequate signal for the voice communicators in several areas
- D. The current AP placement fails to account for the lead-lined wails that are common in patient and exam rooms.
Answer: D
NEW QUESTION 38
What is one benefit that Airwave provides to customers in the 8.x OS network?
- A. ability to monitor the status and operation of the complete network over time
- B. a central UI from which to manage all of the Mobility Controllers (MCs)
- C. profiling of wired and wireless client behavior and detection when the behavior varies from the baseline
- D. in-depth analytics oT mobile device presence and APIs to make this data available to other applications
Answer: C
NEW QUESTION 39
Refer to the exhibit.
A customer has an existing network with ArubaOS switches, Aruba 7205 controller, and 802.11ac APs. The customer needs a wired upgrade for their campus network and wireless upgrade with 802,11ax APs and would like to get all the functions of AP.
The customer has one building with 3 floors with the following wired devices,
* 200 VOIP phones
* 8 printers
* security cameras
The architect plans to propose 75 AP-535s.
The security cameras are a high definition pan-tilt-zoom with heaters for harsh environments that require more than 45 W to function, Which exhibit shows an access switch mat meets the customer needs?
A)
B)
C)
D)
- A. Option C
- B. Option B
- C. Option A
- D. Option D
Answer: D
NEW QUESTION 40
A customer has an Aruba wireless netwofK with:
* Two 7205 Mobility Controllers (MCs) in a cluster - Each MC must be able to support the complete network in the case of an MC failure
* 250 APs. which support a total of 7.500 devices
* A virtual CxQCQ ClearPass appliance with 1QK Access licenses
* An MM-HW-1K appliance
The customer is interested in an upgrade to Aruba CX Switches, primarily to benefit from the per-user tunneled node feature. The customer requires support for 2500 ports, and 95 percent of wined endpoints will use tunneled node.
Which change to the existing solution should the architect explain?
- A. The Mobility Master will need more MM licenses to support the wired endpoints that use tunneled node.
- B. A separate ClearPass virtual appliance will be required to integrate with the AQS-Switches
- C. A new controller will be required to support sufficient clients, including the wired ones.
- D. The clustering feature will need to be disabled on the controllers, so that they can support tunneled node.
Answer: D
NEW QUESTION 41
Refer to the exhibit.
A customer has these availability requirements;
* loss of one controller with stateful failover and without impact on wireless client connectivity
* loss of one core switch without loss of connectivity for any endpoints or APs in the building
* loss of any one switch-lo-switch or MC-to-switch link without loss of connectivity for any endpoints or APS in the building and with minimal impact on infrastructure functionality
* loss of any one access switch with minimal impact to wireless client connectivity The exhibit shows the current plan for the topology.
Which change should the architect make to the plan to provide better support for the customers availability requirements?
- A. Add VLANs 11 and 15 to the MC connections to ensure both MCS can manage any of the APS.
- B. Use two 40GBE DACs between the core V3X switches for their switch links.
- C. Add 120 additional AP licenses, so that each MC can support ail the APs, even if the other MC fails.
- D. Change the 40GbE DAC on the 8400 switch to a stacking cable with stacking module.
Answer: C
NEW QUESTION 42
Refer to the exhibit.
This warehouse has the dimensions shown in the exhibit. The warehouse is 20 feet (6 m) high up to a steel railing on the celling. The shelves are about 16 feet (5m) high, and they hold large containers filled with fluid and metal equipment.
The customer needs consistent wireless coverage throughout the warehouse, mostly to support the tablets that employees use to run Inventory tracking and other applications. The warehouse staff works in shifts of 20.
The architect has selected AP-515S. About how many APs should the architect propose?
- A. about 6-4
- B. about 13-16
- C. about 6-8
- D. about 23-32
Answer: C
NEW QUESTION 43
A retail customer is doing a wired and a wireless refresh with Arut>a CX switches and S02.11ax APs. Currently, trey nave wireless Point of Sales (PoS) systems and would like to assure that the proposed deployment solution will comply with the Payment Card Industry (PCI) Data Security Standard (DSS) requirements.
The architect have proposed the following deployment solutions regarding PCI DSS requirements'
-IDS/IPS
-Aruba APs in hybrid mode as well as in dedicated AMs mode
-Strong authentication and encryption for wireless
-Built-in firewall and role-based access controls to segment WLAN
Which other requirements must you include in the existing deployment solution? (Select two.)
- A. Role-based access controls for wired users using ClearPass. Optionally ; tunneled-node to MCs.
- B. Aruba Central or Aruba AirWave to generate a scheduled compliance reporting.
- C. Switch high-availability solution VSF and VSX also can encrypt all traffic on their switch links.
- D. Suggest MACSet between the Aruba CX switches that encrypt all traffic over the link.
- E. Select the FIPS/TAA-compliant version for the Access Points.
Answer: A,B
NEW QUESTION 44
Refer to the exhibit.
A hotel needs a wireless solution, i he hotel has 802.3af switches.
The architect has selected the 505H Series, controlled by a local MC as the best choice The 5QoH series will need to power a connected phor which have only a single Ethernet port. The architect has created the BOM shown in the exhibit. (Note that this portion of the BOM does not inc Which correction should the architect make?
- A. Propose new direct power source for phone.
- B. Change the 5Q5H to the 3Q3HR model.
- C. Upgrade to PoE+ switches.
- D. Remove the mounting adapters.
Answer: A
NEW QUESTION 45
Which scenario Indicates the need for a wireless mesh?
- A. A hospital needs to provide high availability for wireless services in certain areas which support very critical wireless medical devices. Devices must always be in range of at least two APs.
- B. A nsstorical building has some wired areas and a few areas with no wired or wireless connectivity, walls and ceilings have asbestos. The company needs wireless access across the site.
- C. A company has a small branch office with just one RAP. The company has noticed that performance is poor in some areas of the network and wants to add another AP.
- D. A company needs to provide seamless roaming and wireless access between two buildings. The buildings are about 60 feet (18 m) apart.
Answer: D
NEW QUESTION 46
......
Guaranteed Success with Valid HP HPE6-A80 Dumps: https://testking.practicematerial.com/HPE6-A80-questions-answers.html

